This is the construction plan-New Elevations.
Taking apart the house one piece at a time....
![](resources/IMG_20170828_092454469%20%282%29.jpg.opt715x1271o0%2C0s715x1271.jpg)
Hippy Mike better watch out!..
![](resources/IMG_20170828_083932327%20%282%29.jpg.opt715x402o0%2C0s715x402.jpg)
New stemwall surounding the North & West elevations.
New slab in front of breezeway & along the East Elevation.
Demolition begins along with a new perimeter foundation. The fireplace chimney is the first thing to go.
The Murpy house-Before. There will soon be a major transformation. This is the South Elevation overlooking the swimming pool & swim up bar.
The gated breezway, also a North Elevation. The 2nd story will be above the breezeway.
North Elevation
West Elevation